Inside production

Follow the pump from components to performance testing.

A visual introduction to machining, automated motor work, electronics, assembly and test stages used across the production scope.

Production logic

Control the details that affect repeat supply.

  1. 01Component preparation

    Machining and incoming parts are checked before motor and pump assembly.

  2. 02Motor & control work

    Winding, coil insertion and electronics are matched to the planned configuration.

  3. 03Assembly & testing

    Pump assembly and performance checks follow the confirmed model and order basis.

Production stages

Equipment, people and verification.

The images below are provided from the working production environment. Exact equipment routing varies by product family.

Production workshop and machining equipment
01 / WORKSHOP

Production workshop & machining

Machining and component preparation support dimensional control before assembly. This stage helps establish the basic fit, alignment and repeatability required by the planned pump family.

  • Component preparation
  • Machining control
  • Pre-assembly checks
Machine-automated motor coil winding equipment
02 / AUTOMATION

Machine-automated coil winding

Automated winding equipment forms motor coils for consistent slot preparation and repeatable production.

  • Automated coil winding
  • Turn-count consistency
  • Motor configuration matching
Machine-automated stator coil insertion equipment
03 / AUTOMATION

Machine-automated coil insertion

Automated insertion equipment places formed coils into stator slots with consistent positioning and production efficiency.

  • Automated coil insertion
  • Slot positioning
  • Process consistency
Circuit board research and inspection equipment
04 / ELECTRONICS

Circuit-board R&D and inspection

Control-board development and optical inspection support smart-pump functions and model-specific electronic reliability.

  • PCB development
  • Optical inspection
  • Smart-pump control support
Water pump performance test bench
05 / TESTING

Water-pump performance testing

Performance data is checked against the agreed configuration and test basis before shipment documentation is finalized.

  • Flow and head reference
  • Electrical operating checks
  • Order-specific test basis
Verification note

Match evidence to the actual model.

Production photos explain capability, but final acceptance should use the agreed model, specification, inspection basis and shipment documentation.

Prepare an order quotation